Fabricated metal

Operations systems for fabricated metal shops in Middle Tennessee

For owner-run fabrication and weld shops with 20 to 499 employees. We find the cell that sets your pace, put a dollar figure on it, and build a daily system on the tools you already own.

What we often hear

Common problems in this industry.

  • Costing fab and weld work is hard. The real cost of a job shows up after it ships.
  • One cell, often welding or fit-up, sets the pace for the whole shop.
  • Bid hours and actual hours drift apart, and the gap shows up at month-end.

Signs it may be time: a customer asks for data you can't easily produce, including CMMC requirements for defense suppliers; a labor squeeze; or a recent costly surprise.

The three steps

What the three steps look like here.

  1. Step 1: Walk the floor

    We follow a job from cut to ship and find the cell where work waits.

  2. Step 2: Build it on your tools

    We connect your bids, schedule and time clock, so bid and actual hours sit side by side.

  3. Step 3: Run the cadence

    Your team reviews the pacing cell and yesterday's jobs in a short daily huddle.

Running a shop or warehouse in Middle Tennessee? I'd like to learn how your week really runs.

I'm talking with owners and operations managers about where cost and schedule information breaks down. 30 minutes, no pitch, no slides.

Book a floor walk.

We walk your floor together and find the one constraint holding your margin back.